
A roof is priced by the square — 100 square feet of roof surface — and the total is mostly decided before anyone picks a shingle color. Pitch, size, layers, decking and flashing set the number. The brand on the bundle is a smaller variable than most people expect.
Here is the uncomfortable part of roof pricing. The three items that swing a bid the hardest are the three that a low bidder quietly leaves out.
What actually drives the number
Squares, not square feet. A 2,000 square foot house is not a 2,000 square foot roof. Slope and overhangs add surface, so the same floor plan can come in at 22 squares or 30 depending on pitch. Measure the roof, not the house.
Pitch. Under about 7:12 a crew walks the roof normally. Past that they are setting roof jacks, staging bundles and working in harnesses, and production per hour drops. Above roughly 9:12 the labor line stops being proportional and starts being a different job.
Tear-off layers. One layer comes off fast. Two layers is double the labor, double the dumpster and often double the disposal fee, and the fee is by weight.
Decking condition. Nobody knows this until the old roof is off. Deteriorated sheathing around chimneys, valleys and any old leak gets replaced, and that has to be a stated per-sheet price in the contract.
Flashing. Sidewall, chimney, valley, pipe boots, step flashing. New flashing costs money. Reused flashing costs money later.
Complexity. Every valley, dormer, saddle, skylight and penetration is hand work. A simple gable and a cut-up hip roof of the same square footage are not the same bid.
The line items worth paying extra for
Some upgrades are marketing. These four are not.
Balanced ventilation. Intake at the soffit, exhaust at the ridge, sized to the attic. A shingle roof over a stagnant 150-degree attic loses years off its rated life from the underside. This is the single most-skipped item in the trade and it is why roof ventilation is a line on our scope sheets rather than an afterthought.
Ice-and-water membrane at eaves, valleys and penetrations. In any climate that freezes, this is the difference between a wet ceiling in February and nothing happening.
All new flashing. Not reused, not caulked. Step flashing woven into the courses at sidewalls, and a real chimney counterflashing rather than a bead of sealant.
A written workmanship warranty with a stated number of years. Manufacturer warranties cover the shingle, which almost never fails first. Installation is what fails first.
What is usually not worth it
A 50-year shingle on a house you will sell in eight. You are prepaying for service life you will hand to a stranger.
Premium designer shingles chosen from a two-inch sample. Look at a full board in daylight on your own wall, or better, at an installed roof three streets over. Color reads completely differently at scale.
Ridge vent added without opening the intake. A ridge vent with no soffit intake pulls its makeup air from inside the house through ceiling penetrations. That is worse than no vent. If the soffits are stuffed with insulation, fix that first or skip the ridge vent.
How to read three bids that look nothing alike
Build a one-page scope sheet and make every bidder fill in the same rows.
| Line item | What to require in writing |
|---|---|
| Squares and pitch | Their measurement, stated |
| Tear-off | Number of layers assumed |
| Decking | Per-sheet replacement price |
| Underlayment | Product, plus ice-and-water locations |
| Flashing | New at every location, itemized |
| Ventilation | Intake and exhaust, net free area |
| Pipe boots | New, not reused |
| Warranty | Workmanship years, in writing |
| Cleanup | Magnetic sweep, dumpster placement |
| Permit | Who pulls it, whose cost |
Once the rows match, the totals become meaningful. Before that, the cheapest bid is usually just the one that assumed the least.
The signals that a low bid is hiding something
A number well under the others is information, not a bargain. Look for these tells.
No decking line. Reused flashing, or the word "caulk" doing structural work. No permit. A large deposit demanded before material delivery. No proof of workers' compensation coverage, which is the one that leaves you personally exposed if somebody falls. And a start date tomorrow in a market where everyone else is three weeks out.
When you should not replace at all
We turn down replacement work regularly. A roof with fifteen good years on it and one bad valley needs a valley, not a re-roof. A single failed pipe boot is a sixty-dollar part and an hour of labor, and it produces exactly the same ceiling stain as a dying roof.
A roof inspection that ends in "not yet, call us in four years" is a completely normal outcome. We would rather deliver that than sell a roof early.
The one exception worth naming: if you are inside two or three years of needing a re-roof anyway and you are also about to spend real money on repairs, do the roof. Paying twice for the same access to the same surface is how people end up over budget.
Bottom line
Get three bids on one written scope. Insist on a per-sheet decking price, new flashing everywhere and balanced ventilation. Ignore shingle brand marketing and spend the upgrade money on the assembly underneath. Then pick the contractor whose scope sheet came back most complete, which is usually not the cheapest one and is almost never the most expensive one either.
West Jordan Roof Pros prices roof replacement, asphalt shingle roofs and roof inspections across West Jordan and the Salt Lake Valley, itemized so you can compare it against anyone else's. Call (844) 511-2320 and we will measure the actual roof, including telling you if it can wait.
Ready for a free quote in West Jordan?
West Jordan Roof Pros — free estimate, clear scope, no pressure. Use the form on this page or jump to the homepage quote.
Related services in West Jordan
West Jordan Roof Pros money pages — go straight to the service you need.
- Roof Replacement →
A replacement on the valley floor is decided by the deck, not by the covering. We tear off in the shoulder seasons and find the same thing again and again: sound sheathing across the field, and soft, delaminated panel edges in the first four feet above the eave.
- Roof Inspections →
We will not scope a roof from the surface in January. A frosted or damp covering hides granule loss, hides bruising and makes every stain look alike, so a report written on a January morning is worth considerably less than the paper it prints on.
- Asphalt Shingle Roofing →
Asphalt covers most of West Jordan, and choosing one here turns on how a covering behaves while wet rather than on how it survives a strike. Our planes spend a third of the year damp and shaded, a slower and costlier failure than any impact event.
- Roof Leak Repair →
The most common leak we are called about between December and February is not a leak at all. It is condensation on the underside of the sheathing, forming because the deck sits below the dew point of the air inside the house for weeks at a stretch.
- Storm Damage Roof Restoration →
Storm damage in this valley is usually found late. Wet spring snow and summer downbursts do their work in an hour, then the roof stays cold and damp, and nothing looks wrong from the street until a ceiling browns in February.
Frequently asked questions
How is roof replacement priced?
By the square, which is 100 square feet of roof surface, not floor area. A 2,000 square foot house with a moderate pitch usually has somewhere around 22 to 30 squares of roof once you account for slope and overhangs. That is why two houses with identical floor plans and different roof pitches get meaningfully different bids, and why anyone quoting a price over the phone from your address alone is guessing.
Why do roof replacement quotes vary so much?
Usually because they are not the same scope. The three items that move a bid most are tear-off layers, decking replacement and flashing. A low bid frequently means one layer of tear-off assumed, no decking allowance and reused flashing. Put every bid on the same scope sheet before you compare the totals, because otherwise you are comparing two different jobs.
Does a steeper roof cost more to replace?
Yes, for two reasons. There is more surface area than the footprint suggests, and above roughly 7:12 the crew needs staging, roof jacks and fall protection that slow the work down considerably. Anything past about 9:12 is walk-with-equipment territory and the labor rate reflects it. Very low slope is its own premium because the material changes entirely.
How much should I budget for decking replacement?
Ask for it as a stated per-sheet price rather than a lump allowance, because nobody knows the decking condition until the old roof is off. Some roofs need zero sheets and some need twenty. A bid with no decking line item is not a cheaper bid, it is a bid with a change order waiting inside it.
Is a roof replacement covered by insurance?
Insurance covers sudden damage from a covered peril such as hail, wind or a fallen limb. It does not cover a roof that reached the end of its service life, and most policies now settle older roofs at actual cash value rather than replacement cost, which means depreciation comes out of the check. Age of roof and cause of failure are the two things an adjuster is deciding.
How long does a roof replacement take?
A typical single-family asphalt re-roof is one to three days of actual work once the crew is on site. Steep, complex, multi-layer or large roofs run longer, and weather stops everything. The scheduling lead time before that is usually the longer part, especially in the weeks after a regional storm when every crew in the market is booked.
Local context
How this applies in West Jordan, UT
Every article here is written from roofing work done in West Jordan and the Salt Lake Valley, so the numbers reflect local labour, permit and material costs rather than a national average. Your own job can land either side of them depending on access, the condition of what is already there, and the materials you pick — vapor-permeable synthetic underlayment, self-adhered eave and valley membrane, ring-shank sheathing nails at six inches on center.
The way to turn any of this into a real answer is to have someone look at your actual situation. The free estimate is free, itemized and written down, with no deposit and no obligation. Call (844) 511-2320 or start on the West Jordan Roof Pros homepage.
Areas West Jordan Roof Pros covers
West Jordan first, then the surrounding communities of the Salt Lake Valley. Each has its own page with local detail rather than a copy of this one:
- Taylorsville, UT — Salt Lake County, population 60,448
- Murray, UT — Salt Lake County, population 50,637
- Midvale, UT — Salt Lake County, population 36,028
- South Salt Lake, UT — Salt Lake County, population 26,777
- Holladay, UT — Salt Lake County, population 31,965
- Cottonwood Heights, UT — Salt Lake County, population 33,617
Or jump to the full list of West Jordan services.
More from the West Jordan Roof Pros blog
- Roof Inspection Cost in West Jordan: What You Get for the Money
A real roof inspection produces a photographed, slope-by-slope report. Here's what one costs in West Jordan, UT, and how to tell it from a sales visit.
- Metal Roof vs Shingles in West Jordan: The Honest Comparison
Metal costs roughly two to three times what asphalt does and lasts two to three times as long. Here's when that math works in West Jordan, UT, and when it doesn't.
- How to Find and Fix a Roof Leak in West Jordan
Water rarely enters where the stain appears. Here's how to trace a roof leak in West Jordan, UT, what you can fix yourself, and what needs a roofer.
The West Jordan Roof Pros Team
Licensed roofing pros in West Jordan, UT
Written by the West Jordan Roof Pros team — licensed, insured roofing pros serving West Jordan, UT and the surrounding area.